This week’s work
Enjoy these shots of the building this week!
The auditorium from the top corner of the risers:
The auditorium from the back of the stage:
Concrete poured for the risers and the riser stairs:
Concrete poured for the stage and its stairs:
The UpStreet hall with paint on it:
And the freshly painted UpStreet large group room:
Waumba Land hallway with ceiling grid in place:
An UpStreet room with lights going in:
Storefront work beginning on student ministry:
Storefront work on the Starting Point rooms:
Inside a starting point room:
Countertop installed in the restrooms:
Painting being done outside the auditorium: